This project is for HUAWEI group logistic steel structure industrial zone, building turnkey project including steel structure, roof and wall, window doors, Air conditioner system, fire proection system etc.
The external roof and wall used as galvanized colorbond sheetings.
Number | Part Name | Details |
1 | Turnkey project | Yes: Design+Material+Installation for industrial logistic usage |
2 | Area | Multi span building |
3 | Structure | Portal structure + frame structure |
4 | External roof | 780 wave cladding sheet+insulation |
5 | External wall | PUR sandwich panel |
6 | Outdoor | Industrial upford door, steel door |
7 | Construction time | 6 months for whole building construction |